Live project Ashford, Kent

Mabledon
Avenue.

Plumbing and heating for residential developments in Kent.

New homes.
A lower-carbon future.

Explore the development
Artist’s impression of pale-brick homes at Mabledon Avenue, with gabled roofs, landscaped planting and communal outdoor areas.
Artist’s impression of Mabledon Avenue, Ashford. Illustrative view of the proposed development.

The development

Affordable homes.
In Ashford, Kent.

Working with main contractor WW Martin, HMS is delivering the plumbing and heating package for 20 affordable homes at Mabledon Avenue in Ashford, Kent. The development for Ashford Borough Council makes use of previously developed land, supporting the supply of affordable housing in the borough. Works are underway on site.

20.

New affordable homes

Houses
14
Apartments
06
Development for
Ashford Borough Council
Main contractor
WW Martin

The approach

More considered.
Inside and out.

A welcoming neighbourhood designed around communal spaces, landscaped areas and an emphasis on sustainability.

Energy

Targeting EPC A.

The development is targeting an EPC A rating, with energy efficiency a central consideration in the design of the new homes.

Renewable heating

Ground-source technology.

The scheme incorporates ground-source heat pumps as part of its approach to lower-carbon homes.

Neighbourhood

Space to come together.

Communal spaces and landscaped areas are central to the design, helping create a welcoming setting for residents.

HMS on site

Plumbing & heating.
For Kent developments.

HMS is delivering the plumbing and heating installation at Mabledon Avenue in Ashford, a development of 20 affordable homes for Ashford Borough Council, working with main contractor WW Martin. Our package includes ground-source network connections, Kensa Shoebox heat pumps, domestic water services, above-ground drainage, unvented hot-water cylinders and sanitaryware, through to testing, commissioning and handover.

For main contractors and developers planning new-build housing in Kent, this live project shows the scope of HMS’s plumbing, heating and renewable energy installation package.

See our installation scope

Site progress

Inside the build.

From the wider development to the first-fix pipework and drainage inside. Explore the photographs for a closer look at the work underway.

Elevated view of Mabledon Avenue under construction, with scaffolding and timber roof trusses across the new homes.

The development taking shape

A wider view of the homes under construction at Mabledon Avenue.

Brick-built homes at Mabledon Avenue surrounded by scaffolding, with site vehicles and building materials in front.

On site in Ashford

Construction progress across the development’s frontage.

Overhead copper pipes with branch connections passing through blockwork partitions.

Branches & connections

Branch connections from the distribution pipework.

Red and blue insulated pipework routed along the ceiling and down an exposed blockwork wall.

Domestic water first fix

Domestic water pipework within the unfinished rooms.

Three copper pipe runs fixed beneath a concrete ceiling above partially boarded partitions.

Ceiling pipework routes

Pipework routes installed ahead of ceiling finishes.

Grey soil stack, white waste pipework and copper water pipes beside a concealed WC cistern.

Soil & waste connections

First-fix drainage and water connections in a bathroom.

A bathroom soil stack with branch connections, copper pipework and a concealed cistern before fittings are installed.

Bathroom first fix

Services prepared ahead of the sanitaryware installation.

Red and blue pipework and waste connections within exposed metal wall framing in an unfinished bathroom.

Services within the walls

Water and waste connections within the bathroom partitions.

Bathroom wall pipework, capped drainage connections and exposed pipe loops within the unfinished floor.

Before the finishes

A view of the bathroom services before the finishes are installed.

Our scope

From the pipework
to the handover.

HMS’s installation package covers the water, heating and above-ground drainage systems, together with hot-water storage, sanitaryware and commissioning.