Targeting EPC A.
The development is targeting an EPC A rating, with energy efficiency a central consideration in the design of the new homes.
Live project Ashford, Kent
Plumbing and heating for residential developments in Kent.
New homes.
A lower-carbon future.

The development
Working with main contractor WW Martin, HMS is delivering the plumbing and heating package for 20 affordable homes at Mabledon Avenue in Ashford, Kent. The development for Ashford Borough Council makes use of previously developed land, supporting the supply of affordable housing in the borough. Works are underway on site.
New affordable homes
The approach
A welcoming neighbourhood designed around communal spaces, landscaped areas and an emphasis on sustainability.
The development is targeting an EPC A rating, with energy efficiency a central consideration in the design of the new homes.
The scheme incorporates ground-source heat pumps as part of its approach to lower-carbon homes.
Communal spaces and landscaped areas are central to the design, helping create a welcoming setting for residents.
HMS on site
HMS is delivering the plumbing and heating installation at Mabledon Avenue in Ashford, a development of 20 affordable homes for Ashford Borough Council, working with main contractor WW Martin. Our package includes ground-source network connections, Kensa Shoebox heat pumps, domestic water services, above-ground drainage, unvented hot-water cylinders and sanitaryware, through to testing, commissioning and handover.
For main contractors and developers planning new-build housing in Kent, this live project shows the scope of HMS’s plumbing, heating and renewable energy installation package.
See our installation scopeSite progress
From the wider development to the first-fix pipework and drainage inside. Explore the photographs for a closer look at the work underway.

A wider view of the homes under construction at Mabledon Avenue.

Construction progress across the development’s frontage.

Branch connections from the distribution pipework.

Domestic water pipework within the unfinished rooms.

Pipework routes installed ahead of ceiling finishes.

First-fix drainage and water connections in a bathroom.

Services prepared ahead of the sanitaryware installation.

Water and waste connections within the bathroom partitions.

A view of the bathroom services before the finishes are installed.
Our scope
HMS’s installation package covers the water, heating and above-ground drainage systems, together with hot-water storage, sanitaryware and commissioning.
Installation of all domestic hot and cold-water distribution pipework throughout the development.
Connections to the below-ground pipework serving the ground-source heat pump system.
Installation of Kensa Shoebox ground-source heat pumps, together with risers and distribution pipework serving each apartment.
Installation of the above-ground soil and waste drainage systems.
Installation of unvented domestic hot-water cylinders.
Installation of the specified sanitaryware throughout the development.
Testing and commissioning of HMS’s installed systems, followed by handover of our completed installation package.
For main contractors & developers
Discuss the plumbing, heating and renewable energy requirements for your next residential scheme with HMS.